Tubman Boulevard, Congo Town,

Monrovia, Liberia

Liberia

Badge Icon Country and Sector Profile

Liberia: A Country Ready for Renewable Power

The Country

Liberia lies on the Atlantic coast of West Africa and borders Sierra Leone, Guinea and Côte d'Ivoire. It covers 111,000 km² and has a 537 km coastline. Its population is about 5.4 million, of whom more than 1.1 million live in the capital, Monrovia. The country has 15 counties and 16 indigenous ethnic groups, and English is the official language. It has a tropical climate, with a rainy season from May to November and a dry season from November to April.

111,000 km²

Area

537 km

Coastline

~5.4M

Population

1.1M+

Live in Monrovia

15

Counties

16

Indigenous ethnic groups

Solar panels and wind turbines
Badge Icon The Economy

The Economy

Agriculture employs about 70% of the population. Iron ore, natural rubber and timber are the main exports and the main source of foreign exchange. Nimba County is the country's principal iron ore region. Forests cover about 4.79 million hectares, 58% of the land area, and hold about 40% of the remaining Upper Guinean rainforest in West Africa. Liberia imports all of its petroleum fuels.

~70%

Of the population employed in agriculture

Iron Ore, Rubber & Timber

Main exports; Nimba County is the principal iron ore region

4.79 Million Hectares

Of forest, 58% of the land area, holding about 40% of the remaining Upper Guinean rainforest in West Africa

Imported Fuel

Liberia imports all of its petroleum fuels

Badge Icon The Power Sector

The Power Sector

Since reconstruction began after the civil war, installed capacity has grown from about 22 MW in 2014 to about 126 MW in 2024, and electricity access has roughly doubled to about 32.5%. Customer connections nearly doubled in two years, from 142,947 in 2021 to 282,505 in 2023. The residential tariff has fallen from USD 0.52/kWh in 2014 to USD 0.24/kWh, though it remains among the highest in the region.

~126 MW

Installed capacity in 2024, up from about 22 MW in 2014

~32.5%

Electricity access, roughly doubled

282,505

Customer connections in 2023, up from 142,947 in 2021

USD 0.24

Residential tariff per kWh, down from USD 0.52/kWh in 2014

Source Capacity Role
Mount Coffee Hydropower 88 MW About 70% of generation; output falls sharply in the dry season
Heavy fuel oil plants, Bushrod Island 38 MW High-cost backup for dry-season deficits
Regional imports via CLSG Up to ~50 MW From Côte d'Ivoire and Guinea; supply often interrupted
Badge Icon The Supply Gap

The Supply Gap

01

Seasonal Hydro Shortfall

In the dry season Mount Coffee's output can fall to about 30 to 57 MW.

02

Unreliable Imports

Disruptions on the regional line have at times cut Liberia's import share to 10 to 15 MW, causing severe load-shedding.

03

Fast-Growing Demand

With only a third of the population connected, true demand is far higher than measured demand. Peak demand is projected to reach about 388 MW by 2030.

National Commitments

National Commitments

Under the World Bank and African Development Bank Mission 300 initiative, Liberia's National Energy Compact targets 75% electricity access and a 75% renewable share by 2030, with about 100,000 new connections a year. The Government has launched procurement for utility-scale solar power. LGE's projects contribute directly to these goals.

75%

Electricity access by 2030

75%

Renewable share by 2030

~100,000

New connections a year

Utility-scale solar plant with wind turbines

400–550 m

Plateaus above sea level

Badge Icon Why Nimba County

Why Nimba County

Nimba is an upland county of rolling plateaus 400 to 550 metres above sea level. It is drier, sunnier and cooler than the coast, and it hosts the Yekepa substation on the Côte d'Ivoire, Liberia, Sierra Leone and Guinea (CLSG) interconnector, which forms part of the West African Power Pool. This combination of strong sunshine, available land, mining and industrial demand, and a direct connection to the regional grid makes Nimba a natural centre for large-scale power generation.

  • Strong sunshine

  • Available land

  • Mining and industrial demand

  • Direct connection to the regional grid

Country data: AfDB, World Bank, LERC, LEC (2024).